Context of '1994: EPA Advises that Soil Contaminated by Asbestos Should Be Removed after Demolition'

This is a scalable context timeline. It contains events related to the event 1994: EPA Advises that Soil Contaminated by Asbestos Should Be Removed after Demolition. You can narrow or broaden the context of this timeline by adjusting the zoom level. The lower the scale, the more relevant the items on average will be, while the higher the scale, the less relevant the items, on average, will be.

The EPA explains in a document setting guidelines for the decontamination of demolition sites that the “site must be cleaned up to background levels of asbestos contamination.” (The term, “background level” refers to the typical asbestos level of non-contaminated soil in that area.) The EPA adds that in order to “clean up the site to background levels, it will probably be necessary to remove all the asbestos contaminated soil. The contaminated soil should be treated and disposed of as asbestos-containing waste material.” [Environmental Protection Agency, 6/29/1994; Jenkins, 3/11/2002 pdf file]

Entity Tags: Environmental Protection Agency

Timeline Tags: Environmental Impact of 9/11

The EPA issues a publication which states that in the event of a terrorist attack causing the release of hazardous substances, the EPA would respond under the authority of the NCP (see 1972). “The US Environmental Protection Agency (EPA) has statutory authorities and responsibilities to prepare for and respond to emergencies involving oil and hazardous substances, pollutants or contaminants, which include chemical, biological and radiological materials that could also be components of a weapon of mass destruction (WMD)…. EPA carries out its preparedness and response efforts primarily under the mandate of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) and the Radiological Response Program.” [Environmental Protection Agency, 5/2000 pdf file]

Entity Tags: Environmental Protection Agency

Timeline Tags: Environmental Impact of 9/11

The Environmental Protection Agency’s (EPA) Region 2’s legal counsel advises in a draft document (obtained by the New York Environmental Law and Justice Project through a Freedom of Information Act): “[AHERA] was developed to determine whether school buildings where asbestos was used are safe. Under this test, an air monitor pumps room air through a special filter for a specified amount of time. Then the number of asbestos ‘structures,’ or fibers, on a square millimeter of the filter are counted. If there are fewer than 70 such structures, the air is judged to be acceptable. EPA has used this same school-based standard to evaluate the safety of outside air in downtown Manhattan.” [Jenkins, 3/11/2002 pdf file] The EPA counsel’s statement is a misinterpretation of AHERA (see October 3, 2001-March 1, 2004).

Entity Tags: Environmental Protection Agency

Timeline Tags: Environmental Impact of 9/11

Environmental Protection Agency (EPA) Administrator Christie Todd Whitman, appearing before Congress, states: “Under the provisions of PDD 62, signed by President Clinton in 1998, the EPA is assigned lead responsibility for cleaning up buildings and other sites contaminated by chemical or biological agents as a result of an act of terrorism. This responsibility draws on our decades of experience in cleaning up sites contaminated by toxins through prior practices or accidents.” Her deputy, Linda Fisher, will repeat this to Congress a week later (see December 5, 2001). [US Congress, 4/12/2002]

Entity Tags: Christine Todd Whitman, Environmental Protection Agency, US Congress

Timeline Tags: Environmental Impact of 9/11

The Environmental Protection Agency (EPA) quietly lifts a 25-year-old restriction on the sale of PCB-contaminated land. PCBs, or polychlorinated biphenyls, are linked to cancer and neurological problems. The rollback, based on an EPA reinterpretation of an existing law, is announced in an internal memo written by EPA general counsel Robert Fabricant. Fabricant claims in the memo that the old interpretation represented “an unnecessary barrier to economic redevelopment.” Because the change is considered a “new interpretation” of existing law, the administration has no legal obligation to make a public announcement. Critics, including some EPA staffers, note that the longstanding ban served as an incentive for landowners to notify the EPA of the contamination and clean up their property. As a result, about 100 sites a year were submitted to the agency for review. They also warn that the new policy will make it hard to track sales of polluted sites and to ensure that buyers properly assess the land prior to development. [Environmental Protection Agency, 8/14/2003 pdf file; USA Today, 9/1/2003; New York Times, 9/3/2003]

Entity Tags: Bush administration (43), Environmental Protection Agency, Robert E. Fabricant

Timeline Tags: US Environmental Record

Ordering 

Time period


Email Updates

Receive weekly email updates summarizing what contributors have added to the History Commons database

 
Donate

Developing and maintaining this site is very labor intensive. If you find it useful, please give us a hand and donate what you can.
Donate Now

Volunteer

If you would like to help us with this effort, please contact us. We need help with programming (Java, JDO, mysql, and xml), design, networking, and publicity. If you want to contribute information to this site, click the register link at the top of the page, and start contributing.
Contact Us

Creative Commons License Except where otherwise noted, the textual content of each timeline is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike